How to Start Using DFO's BioChem Query Marine Data Archive in Canada
Register for DFO's BioChem archive, query marine biological and chemical data from Canadian waters, and read the ZIP return.
Use Environment and Climate Change Canada's Regulatory Services Platform for the services verified on opened official pages — the Migratory Game Bird Hunting e-permit, the Abandoned Nest Registry, Clean Electricity Regulations, the Federal Plastics Registry, the Voluntary Landfill Gas Survey, the toxic substances laboratory report, and the volatile organic compounds regulations — with the platform's own live list, the future permit window for toxic substances, and the landfill reporting route stated plainly where they differ.
Applies in: CA
The Regulatory Services Platform is a new online system from Environment and Climate Change Canada, built to replace old tools and paper-based processes with a single digital portal, and it sits inside the department's Regulatory Service Modernization initiative, which aims to reduce the time, cost, and effort of submitting data and information. That is the platform's own description, and it is also the reason this guide starts with a warning: a single portal name does not mean a single, settled route for every instrument. The department is moving regulations and other risk management instruments to the platform in phases, it will add more instruments over time, and it promises advance notice before adding one, with enough time to prepare. Until an instrument moves, the platform page says to keep using the other reporting system, such as Single Window, and to check the specific regulation for its submission requirements. A hunter, a laboratory, a plastics producer, and a landfill operator therefore start in different places even though the platform name is the same, and the rest of this guide keeps those routes apart.
Start from the instrument's own page. The platform page lists three instruments as now live. The federal sign-in directory groups seven services under the platform name. The Red Tape report says the platform launched in June 2025 for three instruments and that six more were planned by 2026. None of those three statements is wrong on its own; they describe different moments and different kinds of lists, and a reader who picks only one will either miss a live route or try a route that is not open yet. The check that settles it, for every instrument in this guide, is the instrument page opened on the day of use: it names the platform, or it names another route, or it gives a future date or window.
Entry points also differ, and this guide does not paper over that. The platform page offers one Access the Regulatory Services Platform link. The plastics reporting platform has its own landing page, at rfp-fpr.ec.gc.ca, carrying the Regulatory Services Platform name and describing Federal Plastics Registry reporting. The hunting permit is reached through the provincial and territorial hunting summaries and the migratory game bird hunting pages, which name the platform without, in the opened text, giving a typed platform address this guide can safely repeat. Use the link on the official page you are reading. Do not type a platform address from memory, from a search snippet, or from another instrument's entry point, and do not assume that an account created at one entry point is already the account for another instrument until the entry page for that instrument says so.
The platform page lists the platform's benefits in its own words: clear steps for registration, reporting, submission, notification, permitting, authorization, and service fees; a secure and digital design; replacement of manual and out-of-date practices; similar processes for each instrument in one place. The Red Tape report adds, as expected outcomes, organizational accounts with data sharing and centralized records, easier file transfer, faster submission, faster processing from digitalization, real-time automated checks for incomplete information, and less time spent clarifying or correcting errors with the government. Those are the department's claims about the platform as a whole. They are not a promise that any one instrument's form is short, that its fee is waived, or that its decision arrives quickly, and no such promise is made in this guide.
The only account step verified across the opened pages is simple: create an account. The platform page says you will be able to create an account and provide submissions and information for existing instruments. The toxic substances permit page says to create an account ahead of the application period, download and fill out the permit application form, and prepare a draft application report. The plastics landing page says users register their organization and submit compliance data. The Red Tape report says organizational accounts allow data sharing and centralized records.
What the opened pages do not say is equally important. No opened platform page states a sign-in credential, a password rule, a multi-factor step, or a recovery route. This guide therefore gives no GCKey, Sign-In Partner, email-and-password, or other credential instruction for the platform. Follow the credential choice the entry page shows, keep the credential you registered with if the page says to use the same one every time, and do not reuse sign-in steps from Single Window, from a research portal, or from a tax account. If the entry page asks for an organization, register the organization that will be responsible for the submission, and add the people who will actually file under that organization only through the route the entry page offers. If it asks for an individual, as a hunting permit order does, order for the hunter or hunters named, since the 2026 migratory birds report says one or more permits may be obtained at a time, including for multiple hunters.
Save whatever the platform returns at account creation: the account details, the organization record, and any confirmation. The Red Tape report says the platform lets regulated parties access the status of submissions at any given time, and the hunting report says the platform dashboard lets hunters recover a permit and view previous orders. Neither statement describes a general inbox, a correction route, or a way to change a submitted report, and this guide describes none. If a submission needs correcting, contact the instrument's own address in the section below before filing a second copy.
The hunting e-permit is the most fully described platform transaction in the opened pages, and it is also the one with a hard change coming. From August 1, 2026, the electronic permit is available on the platform 24 hours a day, 7 days a week. Physical permits at select Canada Post outlets and some independent vendors remain point-of-sale options for now, and physical permits may be phased out as early as the 2027 to 2028 hunting season starting August 1, 2027, after which the permit will be issued 100 percent electronically. Physical hunting summaries will also be phased out as of the 2027 to 2028 season, with the online provincial and territorial summaries continuing.
To hunt migratory game birds in Canada, a hunter must possess a valid Migratory Game Bird Hunting Permit and a Canadian Wildlife Habitat Conservation Stamp on the permit, and the permit is valid anywhere in Canada where and when there is an open season. The Manitoba summary adds that hunters must carry the permit at all times when hunting or when in possession of unpreserved migratory game birds, that an online permit may be shown as an electronic PDF or a printed copy, that a provincial or territorial licence may also be required, and that it is the hunter's responsibility to be able to show all required permits to a game officer immediately on request. A photograph or screenshot is not described on any opened page as a valid form, and this guide does not treat one as valid: keep the PDF the platform provides.
Order through the platform, complete the order, and immediately download, print, or store the permit on an electronic device. The dashboard recovers the permit and shows previous orders, so a lost PDF is a dashboard recovery, not a second purchase, on the wording of the 2026 report. Answer the hunting history questions the order asks: the report says buying online makes those questions easier to answer and that the answers inform the National Harvest Survey, which, with other Canadian Wildlife Service surveys, assesses migratory game bird populations, productivity, survival rates, and sustainable harvest. No separate survey portal, survey deadline, or survey form was verified, so do not look for one apart from the order.
The youth permit follows its own rule. It is available to hunters who are minors, under 18 years old on the day the permit is issued. The youth permit and the electronic stamp are free of charge and can only be obtained through the platform. A mentor must hold a personal permit, must have held one in a previous year, and may accompany no more than two youth permit holders at a time. Provinces and territories may add requirements for minors and mentors, so check the summary for the province or territory where the hunt will happen. No adult fee is stated in this guide. The order page and the current provincial or territorial summary are the places to read the fee, the season dates, and the bag and possession limits before paying, because none of those figures was verified on an opened official page for this guide.
The registry is a notification, not a permit, and the distinction decides what to do. A notification starts a waiting period. It does not authorize removal on the day it is filed, and it does not authorize removal of a nest that holds a live bird or a viable egg. Only the nests of the eighteen species listed in Schedule 1 of the Migratory Birds Regulations, 2022 receive year-round protection with this registry route, because those species reuse nests in later years. The nests of most other migratory bird species may be damaged, destroyed, disturbed, or removed when they do not contain a live bird or a viable egg, according to the FAQ page, and provincial or territorial law may add protection on top of the federal rules.
File only if the conditions fit. The notifier should own the land or hold the necessary authorization to eventually remove the nest, and should intend to remove it once the waiting period has elapsed. A nest that will be left undisturbed needs no notification. A nest found before July 30, 2022 cannot be entered with that earlier date: the system accepts July 30, 2022, the date the 2022 regulations came into force, as the earliest date.
Enter the information the Notice and FAQ pages list: contact information including email address, name, organization name, address, and phone number; the date the abandoned nest was found, by year, month, and day; the species name; the number of nests for colonial species; the latitude and longitude in decimal degrees and the province; and additional details. The FAQ page describes the same fields in shorter form: company name if applicable, contact name and contact information, the date found, the species name, the number of nests for colonial species, and the coordinates and province. File the notification, keep the confirmation, and note the date the department received it, because the Notice page ties the start of the waiting period to receipt.
Then wait, and verify the nest stays unoccupied during the period for that species: 12, 24, or 36 months. The regulations do not dictate a required level of monitoring and do not require record keeping, but verifications should occur when a nest could reasonably be expected to be in use, such as during the breeding season, so that an unoccupied finding means something. The nest remains protected during the wait. If a migratory bird occupies it, the notification is no longer valid: contact AvisNid-NestNotifications@ec.gc.ca to have the submission cancelled, and file a new notification, restarting the clock, if the nest becomes unoccupied again and removal is still intended. The FAQ page also says a notification can be rescinded through the registry in that situation. The Pileated Woodpecker wait is 36 months on the FAQ page's example, which also covers the utility pole case where a cavity compromises a pole: a permit, not a registry notification alone, is the route discussed there, and the regional office should be contacted first.
Do not use the registry for an active nest. For a nest with a live bird or a viable egg, or a Schedule 1 nest before its wait has passed, the FAQ page says a permit may be available in limited situations as a last resort, where avoidance is not possible, mitigation has been attempted, and waiting is not possible, and it lists Scientific Permits and Damage or Danger Permits under sections 70 and 71. Contact the local Canadian Wildlife Service regional office and discuss the situation with a permit officer before applying. The registry does not replace that permit route.
Plastics reporting is mandatory for those who meet the notice requirements, annual, and phased. The legal basis is the section 46 notice for 2024, 2025, and 2026, published in the Canada Gazette, Part I on April 20, 2024. The Phase 1 guide covers reports due in 2025 on 2024 data, and it says a later version will cover reporting years 2026 on 2025 data and 2027 on 2026 data. That versioning matters: a producer who files on Phase 1 rules in a later year without opening the current guide and notice risks filing the wrong categories.
Phase 1 covers producers of plastic packaging, electronic and electrical equipment, and single-use or disposable products, only for products that typically accumulate in households and enter the residential waste stream. Producers report the quantity of plastic imported, manufactured, and placed on the market in Canada for those categories. The guide's producer definition turns on brand ownership and on who first imports, manufactures, or supplies a product in Canada, with a marketplace facilitator deemed the producer for a marketplace seller's products, and a franchisor as the obligated producer where franchisees place packaging or products in any province or territory. A producer with several brands may file one report for all brands or register each brand separately. Work out producer status from the guide's definition and the notice before opening the platform form, because the platform asks for an organization registration and the report follows from who that organization is.
The de minimis exemption is narrow and national. Persons manufacturing, importing, or placing on the market less than 1,000 kilograms of plastic products or packaging per calendar year are exempt, on the total combined weight of the plastic in the items in the categories for that year, added across provinces and territories. Recalculate it every year and keep the calculation records. The guide's example makes the edge plain: 500 kilograms manufactured plus 500 kilograms imported reaches 1,000 kilograms and must be reported in full.
File by September 29 of the year following the data year, which was September 29, 2025 for 2024 data in Phase 1. The guide lists three calculation methods, the specific component identification method, the average bill of materials method, and the fixed-factor calculation method, and it says alternative methods may be used. This guide does not choose a method, reproduce a factor, or list the subcategories, because those belong in the current guide, the notice schedules, and the platform form for the reporting year. Keep copies of all records for three years after the reporting deadline, including detailed data and calculations. Questions go to RFP-FPR@ec.gc.ca, from the guide. If the platform form and the guide disagree on a category or a field, stop and ask at that address rather than guessing, since a late, missing, or knowingly false or misleading report carries penalties under section 272 of the Canadian Environmental Protection Act, 1999.
These three instruments share a platform page listing, and little else. Treat each on its own page, and do not transfer a deadline, a form, or a threshold from one to another.
For clean electricity, file the registration report the regulations require, in the time the regulations set. Section 7 requires the responsible person, the owner or the person with charge, management, or control of a unit, to submit a registration report with the Schedule 2 information by the later of December 31, 2025 and the 60th day after the unit meets the section 5 criteria. The Minister assigns a registration number on receipt and informs the responsible person. If a registered unit is modified so that new units meeting the criteria are created, a registration report for each new unit is due within 60 days of creation, with a cessation notice or an updated report for the original unit. Any change to submitted information requires an updated registration report no later than 60 days after the change. That is the full extent of the clean electricity filing detail verified for this guide. Whether a later emission report, reconciliation report, or compliance credit filing also runs through the platform, and what it contains, must be read in the regulations and on the instrument page for the compliance period in question.
For the volatile organic compounds storage and loading regulations, this guide states the full title and the platform listing, and nothing further about filing. No opened page stated the form, the information to submit, a deadline, or a fee. Open the regulations page and the platform form for the facility or operation concerned, confirm that the storage and loading regulations, not another volatile organic compounds instrument, are the ones that apply, and prepare only what that page asks for. The departmental plan wording that mentions a separate Reduction in the Release of Volatile Organic Compounds Regulations for the petroleum sector is one more reason to use the full title every time.
For landfill reporting, keep the voluntary survey and the regulations apart. The Voluntary Landfill Gas Survey – 2025 appears on the platform page as an Other Tool or Mechanism, not as a regulation, and no opened page stated its questions or its status after 2025. The Landfill Methane Regulations page, by contrast, describes a regulatory route that is still being built toward: applicability by tonnage and waste-in-place, a methane generation assessment using the Landfill Methane Modelling Tool, control requirements beginning in 2028, 2029, or 2035 by generation level and existing systems, and an annual report due June 1 each year once control requirements begin. The reports will be submitted through the platform, in the page's future tense. A landfill operator should therefore do the assessment work the regulations page describes, request the modelling tool and technical guidance document through the route that page gives, and watch the instrument page for the platform submission opening, rather than filing a regulatory report under the voluntary survey listing. Contact for the landfill regulations page is enviroinfo@ec.gc.ca.
Toxic substances work on the platform splits into two different actions with different timing, and confusing them is the main risk in this section. Laboratory and research use reporting is a current platform requirement. Permit applications for continued manufacture or import are a future, windowed platform action. Both run through the platform, on the wording of the opened pages, but they are not interchangeable, and a laboratory report does not create a permit.
Laboratory reporting applies to users of a listed toxic substance, or a product containing one, for laboratory analysis, scientific research, or as a laboratory analytical standard, where the prohibition otherwise applies. Report the Schedule 3 information using the platform before the use of more than 10 grams of each substance in a calendar year. The report must give, for each substance, its name as listed, the anticipated period of use per calendar year, the estimated quantity to be used in each calendar year, and each proposed or actual use, and, for each product containing a substance, the product name, the estimated quantity of the product to be used, and the estimated concentration of the substance in the product, together with the laboratory and authorized person information. Quantities run by calendar year, January 1 to December 31. File a report for every calendar year of use or anticipated use. The 2012 regulations list, as of the December 2017 amendments, runs from 2-methoxyethanol and tributyltins through perfluorinated compounds, chlorinated alkanes, and other named substances on the laboratory page, and the 2025 regulations add Dechlorane Plus and decabromodiphenyl ethane, with laboratory reporting on those two from June 30, 2026, the coming into force date. The 2012 regulations will be repealed and replaced by the 2025 regulations on that date. Check the substance against the list in force on the reporting date, not against a list remembered from an earlier year.
Permit applications are narrower and later. Under the 2025 regulations, permits may be issued for one year and renewed twice, for a maximum of three years in total, to temporarily allow continued manufacture or import of Dechlorane Plus or decabromodiphenyl ethane or products containing them, the import of certain products containing perfluorooctanoic acid or long-chain perfluorocarboxylic acids, and the manufacture or import of certain products containing hexabromocyclododecane or decaBDE, where no specific exemption covers the activity. Permits are not required for exempted, authorized activities listed in Schedule 1. The conditions for issuance are that no technically or economically feasible alternatives are available, that measures to minimize harmful effects have been taken, and that a plan identifying measures to comply within a maximum of three years has been prepared, with the permit conditions maintained throughout the permit period.
The application window is fixed and short. Permit applications must be submitted during the period between July 1, 2026 and July 30, 2026, 30 days after the 2025 regulations come into force, using the platform, and the option to submit the report on the platform will only be available during that period. Ahead of the window, create an account, download and fill out the permit application form, prepare a draft application report, and raise questions with the department. During the window, submit the application report. For renewals, applications must be submitted using the platform at least 90 days before the permit expires. As of the date of this guide, November 3, 2026, that initial window has not opened, so no permit application can be filed yet through the platform on the opened wording, and preparation is the only useful platform step. Contact for both the laboratory and permit pages is the Chemicals Management Division at interdiction-prohibition@ec.gc.ca, with the substances management information line at 1-800-567-1999 in Canada and 1-819-938-3232 outside Canada.
Keep the proof the platform gives, in the form the instrument gives it. Hunters keep the downloaded permit PDF and use the dashboard to recover it. Plastics reporters keep the submitted data and calculations for three years after the deadline. Laboratories keep the yearly report and the quantities behind it, by calendar year. Clean electricity registrants keep the registration number the Minister assigns and the updated reports that follow any change. Nest notifiers keep the receipt date, because the waiting period runs from receipt on the Notice wording. Toxic substances permit applicants keep the draft application report and the form, ready for the July 2026 window, and diary the 90-day renewal rule from the start.
Check status through the platform where the instrument page says status is available. The Red Tape report says the platform provides the ability to access the status of submissions at any given time. No opened page described a general correction, withdrawal, or amendment route for a submitted platform filing, apart from the nest registry rescission, the clean electricity updated registration report, and the toxic substances permit renewal rule, each described in its own section above. If a filing is wrong, contact the instrument's own address before filing again, and do not file a duplicate that could be read as a second submission.
Recheck before the next cycle. The platform page promises advance notice before an instrument is added, with enough time to prepare, and the Red Tape report plans up to 15 added instruments a year. That means the live list in this guide will age: an instrument now on Single Window may move, a future window such as the toxic substances permit period will open and close, and a dated survey such as the 2025 landfill survey may be replaced. Open the platform page and the instrument page again, compare the live list and the instrument's own route, and file through the route the current page names. If the pages still conflict, follow the instrument page for that filing and ask at the instrument contact, keeping both wordings in the message so the answer addresses the conflict.
Both wordings are carried here because the opened pages do not agree, and neither is smoothed over. The [Regulatory Services Platform](https://www.canada.ca/en/environment-climate-change/services/regulatory-services-platform.html) page, as opened, says the following regulations and risk management instruments are now live on the platform: the Clean Electricity Regulations, the Reduction in the Release of Volatile Organic Compounds (Storage and Loading of Volatile Petroleum Liquids) Regulations, and, under Other Tools and Mechanisms, the Voluntary Landfill Gas Survey – 2025. The [Sign in to a Government of Canada online account](https://www.canada.ca/en/government/sign-in-online-account.html) directory, dated October 21, 2026 on the opened page, groups a longer list under the single Regulatory Services Platform account row: Migratory Game Bird Hunting (MGBH) e-Permits and Survey; Abandoned Nest Registry (ANR); Clean Electricity Regulations (CER); Federal Plastics Registry (FPR); Landfill Gas Survey and Regulations; Prohibition of Certain Toxic Substances Regulations; Reduction in the Release of Volatile Organic Compounds Regulations. The [Environment and Climate Change Canada: Red Tape Reduction Plan and Progress Report 2025](https://www.canada.ca/en/environment-climate-change/corporate/transparency/priorities-management/policies-guidelines/red-tape-reduction-report.html) explains the gap in timing: the platform launched in June 2025 for three instruments, the same three the platform page lists as live, and the report says six more instruments were planned to be added by 2026, naming the Prohibition of Certain Toxic Substances Regulations, the Migratory Game Bird Hunting Permit, the Migratory Bird Abandoned Nest Registry, Pollution Prevention Planning, the Pulp and Paper Effluent Regulations, and the Federal Plastics Registry. The service pages then add their own evidence, and this guide follows those pages instrument by instrument: the hunting e-permit is stated to be available from August 1, 2026, the toxic substances laboratory report is stated to be required through the platform, the toxic substances permit application is stated to run only from July 1 to July 30, 2026, the landfill methane reports are stated in the future tense as reports that will be submitted through the platform, and the plastics reporting platform carries the Regulatory Services Platform name on its own landing page. Pollution Prevention Planning and the Pulp and Paper Effluent Regulations, the two planned additions outside the banked scope of this guide, are not described here. Treat the platform page live list as the narrowest verified statement, the sign-in directory as the full grouping, and the instrument page as the check that decides what you can do on the day you open it.
No opened platform page states the sign-in credential, so this guide states none and does not import one from another federal portal. The [Regulatory Services Platform](https://www.canada.ca/en/environment-climate-change/services/regulatory-services-platform.html) page says only that on the platform you will be able to create an account, provide submissions and information for existing instruments, access helpful tips and training materials, and provide feedback on the platform, and it gives a single Access the Regulatory Services Platform link whose address was not shown in the opened text. The [Information for permit applications or renewal for the Prohibition of Certain Toxic Substances Regulations, 2025](https://www.canada.ca/en/environment-climate-change/services/management-toxic-substances/prohibition-certain-toxic-substances-regulations-2025/information-permit.html) page adds the only account preparation step verified for any instrument in this guide: ahead of the permit application period, create an account in the platform, download and fill out the permit application form, and prepare a draft application report. The [Environment and Climate Change Canada: Red Tape Reduction Plan and Progress Report 2025](https://www.canada.ca/en/environment-climate-change/corporate/transparency/priorities-management/policies-guidelines/red-tape-reduction-report.html) says the platform gives regulated parties organizational accounts that allow data sharing and centralized records, and the plastics landing page says the platform streamlines client management, allowing users to register their organization and submit compliance data. Start from the entry point named on the instrument's own page, follow the credential choice that entry page shows, use the same credential every time if the entry page says to, and register the organization or the person the instrument asks for, not a personal account for a company filing or the reverse. If the entry page offers a choice between a Government of Canada credential and a bank sign-in, that choice is the page's own wording on the day you open it, and it is not verified here. For platform problems that are not about one instrument, the platform page gives Regulatory Services Modernization at msr-rsm@ec.gc.ca, and each instrument section in this guide gives its own contact.
Buy it through the platform, carry it every time you hunt, and do not rely on a fee figure from this guide, because no opened official page states the adult permit fee. The [Hunting regulations for migratory birds: Manitoba](https://www.canada.ca/en/environment-climate-change/services/migratory-game-bird-hunting/regulations-provincial-territorial-summaries/manitoba.html) summary for August 2026 to July 2027 says you can purchase an electronic Migratory Game Bird Hunting Permit through the Regulatory Services Platform, that hunters must carry the permit at all times when hunting or when in possession of unpreserved migratory game birds, that a permit obtained online may be presented as an electronic PDF or as a printed copy, and that a provincial or territorial licence may also be required. The [Migratory Birds Regulations in Canada: 2026](https://www.canada.ca/en/environment-climate-change/services/migratory-game-bird-hunting/consultation-process-regulations/report-series/july-2026.html) report lists three point-of-sale options, electronic on the platform, physical at select Canada Post outlets, and physical at some independent vendors, and says that starting on August 1, 2026, the electronic permit will be available on the platform and accessible 24 hours a day, 7 days a week, that one or more permits may be obtained at a time including for multiple hunters, that on completing an order hunters can immediately download, print or store the permit on an electronic device, that the platform includes a dashboard to recover the permit and view previous orders, and that the permit no longer requires a signature to be valid. The same report says buying online makes it easier to answer the hunting history questions that inform the National Harvest Survey, which is the survey half of the banked MGBH e-Permits and Survey wording; no separate survey login or survey form was verified on an opened page, so answer the questions the order itself asks. The youth permit is the one price verified on an opened page: the Manitoba summary says the Youth Migratory Game Bird Hunting Permit, for hunters who are minors under 18 years old on the day the permit is issued, and the electronic Canadian Wildlife Habitat Conservation Stamp are free of charge and can only be obtained through the platform, that the youth permit is practised under a mentor, that mentors must hold their own permit, must have held one in a previous year, and may accompany no more than two youth permit holders at a time, and that many provinces and territories have additional requirements for minors and mentors. Physical permits may be phased out as early as the 2027 to 2028 hunting season starting August 1, 2027, after which the permit will be issued 100 percent electronically, according to both the report and the Manitoba summary. Read the current fee, the season dates, and the bag and possession limits on the order page and the provincial or territorial summary for the place you will hunt before paying, and keep the downloaded PDF where you can show it to a game officer immediately on request.
File a notification, wait out the full period for that species, and do not touch the nest during the wait, even though the registry is electronic and the form itself takes only a few minutes. The [Notice: Abandoned Nest Registry](https://www.canada.ca/en/environment-climate-change/services/migratory-bird-permits/notice-abandoned-nest-registry.html) page says Schedule 1 of the Migratory Birds Regulations, 2022 lists eighteen migratory bird species whose nests are known to be reused in later years, that those nests are protected year-round, and that they may be damaged, destroyed, disturbed or removed only if Environment and Climate Change Canada has received a notification through the electronic Abandoned Nest Registry and the nest remains unoccupied by a migratory bird for the period designated in Schedule 1, 12, 24 or 36 months depending on the species. The clock starts on the day Environment and Climate Change Canada receives the notification, the nest stays protected during the waiting period, and if a bird reuses the nest during the wait the notice becomes void, the registrant is to contact AvisNid-NestNotifications@ec.gc.ca so the submission may be cancelled, and a new notification starts the clock over again if the nest becomes unoccupied again and removal is still wanted. The [Frequently asked questions: Migratory Birds Regulations, 2022](https://www.canada.ca/en/environment-climate-change/services/migratory-bird-permits/faq-migratory-birds-regulations-2022.html) page adds the who and the how: only a proponent who owns the land, or someone with the necessary authorization to eventually remove the nest, and who intends to remove it once the waiting period has elapsed, should submit a notification, and notifications are submitted using the electronic registry, entering company name if applicable, contact name and contact information, the date the unoccupied nest was found, the species name, the number of nests for colonial species only, and the latitude and longitude and the province. The same FAQ page says the earliest date the system will accept is July 30, 2022, the date the 2022 regulations came into force, that the regulations do not dictate a required level of monitoring and do not require record keeping, while verifications should happen when a nest could reasonably be expected to be in use, such as during the breeding season, that no notification is needed for a nest left undisturbed on the landscape, and that a notification that becomes occupied can be rescinded through the registry and a new one filed later. The FAQ wording for the clock differs slightly, saying the period starts on the day the cavity was identified as abandoned and the nest must be registered, while the Notice wording ties the start to the day the department receives the notification; file early enough that both wordings are satisfied, and keep the confirmation. The Pileated Woodpecker example in the FAQ page gives its wait as 36 months. A nest with a live bird or a viable egg is a different case: the FAQ page says a permit may be available in limited situations as a last resort, including Scientific Permits and Damage or Danger Permits, and recommends contacting the local Canadian Wildlife Service regional office before applying. Name variants are preserved here rather than reconciled: the Notice page calls the system the electronic Abandoned Nest Registry and, in its privacy statement, the Registry for Abandoned Nests Website, and the Red Tape report calls it the Migratory Bird Abandoned Nest Registry. Questions about the registration process or system go to AvisNid-NestNotifications@ec.gc.ca, and questions about the act or the regulations go to 1-800-668-6767, both from the Notice page.
Report through the platform landing page for the registry, check Phase 1 scope before assuming a later phase applies, and keep the records for three years. The [Regulatory Services Platform](https://rfp-fpr.ec.gc.ca/en/) landing page at rfp-fpr.ec.gc.ca says the platform is the secure reporting platform that helps organizations report mandatory data or voluntary data to the Federal Plastics Registry administered by Environment and Climate Change Canada, that it streamlines client management so users can register their organization and submit compliance data, and that the registry requires plastic resin manufacturers, producers of plastic products, and service providers to report annually on the quantity and types of plastic they place on the Canadian market and how that plastic moves through the economy. The [Guide for reporting to the Federal Plastics Registry – phase 1](https://www.canada.ca/en/environment-climate-change/services/managing-reducing-waste/reduce-plastic-waste/federal-plastics-registry/guide-reporting-phase-1.html) is the opened guidance for the first phase: reporting is mandatory under subsection 46(1) of the Canadian Environmental Protection Act, 1999, under the Notice with respect to reporting of plastic resins and certain plastic products for the Federal Plastics Registry for 2024, 2025 and 2026 published in the Canada Gazette, Part I on April 20, 2024, and persons who meet the requirements but fail to report, report late, or knowingly submit false or misleading information face penalties under section 272 of that act. Phase 1 requires reporting by producers of plastic packaging, electronic and electrical equipment, and single-use or disposable products, only on products that typically accumulate in households, the residential waste stream, with a deadline of September 29, 2025 on 2024 data, and the guide states the general rule that the deadline to submit reports is September 29 of the year following the data collection year. Reporting is not required in Phase 1 on products destined for the industrial, commercial, and institutional waste stream or the construction, demolition, or renovation waste stream, on plastic waste generated on industrial, commercial, and institutional premises, or by those who import, manufacture, or place resins on the market, and resins and the remaining categories are shown in the guide table as reporting starting in 2026. Persons that manufacture, import, or place on the market less than 1,000 kilograms of plastic products or packaging per calendar year are exempt, calculated on the total combined national weight of the plastic in the items in the categories for that year, and the exemption must be recalculated annually. Keep copies of all records for three years after the reporting deadline, including detailed records of data and calculations. The guide is explicitly focused on Phase 1, reports due in 2025 on 2024 data, with a subsequent version to cover reporting years 2026 on 2025 data and 2027 on 2026 data, so do not carry Phase 1 category limits or the 2025 deadline forward to a later year without opening the current guide and notice, and direct questions to RFP-FPR@ec.gc.ca. The Phase 1 guide itself does not name the Regulatory Services Platform in the opened text, so the platform link for plastics rests on the landing page and the sign-in directory, not on the guide.
All three sit on the platform page live list or in the platform's stated future, but they are at different stages, and the dates below are only the ones an opened official page states. The Clean Electricity Regulations and the Reduction in the Release of Volatile Organic Compounds (Storage and Loading of Volatile Petroleum Liquids) Regulations are the two regulations the [Regulatory Services Platform](https://www.canada.ca/en/environment-climate-change/services/regulatory-services-platform.html) page lists as now live, and the full volatile organic compounds title matters, because a shorter banked wording, Reduction in the Release of Volatile Organic Compounds Regulations, does not distinguish the storage and loading regulations from other volatile organic compounds rules. For clean electricity, the only deadline verified on an opened official page is the registration rule in section 7 of the regulations: the responsible person for a unit meeting the section 5 criteria must submit a registration report containing the Schedule 2 information by the later of December 31, 2025 and the 60th day after the day the unit meets the criteria, the Minister must assign a registration number on receipt and inform the responsible person, and an updated registration report is due no later than 60 days after a change to any submitted information, according to the [Clean Electricity Regulations](https://laws-lois.justice.gc.ca/eng/regulations/SOR-2024-263/section-7.html) text on the Justice Laws site. No emission limit, compliance period, or reporting content beyond that registration rule is stated in this guide, because no opened official page for the platform stated it, so open the regulations and the registration schedule before filing. For the volatile organic compounds storage and loading regulations, no opened platform or regulation page stated a filing form, a deadline, or a fee, so this guide states none: confirm the submission the regulations require, and whether the platform form is the route for it, on the regulation page before preparing anything. Landfill work splits in two. The Voluntary Landfill Gas Survey – 2025 is the third instrument on the platform page live list, under Other Tools and Mechanisms, and no opened page stated its questions, its deadline, or whether it was still open, so do not treat it as a standing annual survey. The [Landfill Methane Regulations](https://www.canada.ca/en/environment-climate-change/services/managing-reducing-waste/municipal-solid/waste-greenhouse-gases-canada-actions/landfill-methane-regulations.html) page is written in the future tense for the platform: the Methane Generation Assessment Report and annual reports will be submitted to Environment and Climate Change Canada through the platform. That page says the regulations apply to certain privately and municipally owned landfills that received municipal solid waste, using either more than 450,000 tonnes of municipal solid waste-in-place after disposing of any quantity after January 1, 2010, or more than 200,000 tonnes in place after disposing of more than 20,000 tonnes in 2025 or a later calendar year, that landfills meeting the criteria must calculate annual methane generation with the department's Landfill Methane Modelling Tool and submit a Methane Generation Assessment Report, that open landfills over 664 tonnes and closed landfills over 1,000 tonnes of methane generation carry further obligations, that methane control requirements first apply in 2028, 2029, or 2035 depending on generation and on whether a gas recovery system already exists, and that an annual report is due June 1 of every year once methane control requirements begin. Do not file a landfill methane report through the platform on the strength of the voluntary survey listing, and do not treat the June 1 annual report as due before the control requirements begin for that landfill.
No sign-in credential for the platform, no adult Migratory Game Bird Hunting Permit fee, no Federal Plastics Registry fee, no Clean Electricity Regulations, volatile organic compounds, or landfill fee, no platform delivery or decision time, no general correction route, and no survey form apart from the hunting order questions are stated in this guide, because none was verified on an opened official page. Figures and claims cut during drafting: the adult hunting permit price and stamp split from search snippets and non-official summaries, which were not opened on an official page; any 2035 or other clean electricity emission limit or compliance date from secondary summaries, since no opened official page stated it for the platform filing; any volatile organic compounds filing form, deadline, or fee; any Voluntary Landfill Gas Survey questions or deadline; any Federal Plastics Registry Phase 2 or Phase 3 dates or delay, since the opened guide covers Phase 1 only and later-phase reporting changes were described only in non-official sources; any Landfill Methane Regulations assessment due date, since the opened regulations page states no assessment deadline; and any typed hunting platform web address, since search snippets gave two spellings differing by a hyphen and no opened page gave an address this guide could repeat. Conflicts are carried as both wordings rather than reconciled: the platform live list of three instruments against the sign-in directory grouping of seven services; the Abandoned Nest Registry, Registry for Abandoned Nests Website, and Migratory Bird Abandoned Nest Registry names; the Notice receipt-based nest clock against the FAQ identification-based phrasing; and the short banked volatile organic compounds title against the full storage and loading title. Recheck the platform page and the instrument page before filing, since phased additions, future windows, and later guidance versions change what is live.