How Much Does Roof Replacement Cost in Ontario
2026 Ontario roof replacement costs: per-square-foot ranges for asphalt, metal, and flat roofs, what drives the bill, and when a permit is needed.
Furnace installation costs in Ontario in 2026 for new builds and homes getting first-time heating: installed ranges by home size ($3,500–$8,500), full ductwork costs ($7,000–$12,000+), Enbridge's new gas service rules (20 metres free, $170.06/metre beyond), and why new builds don't qualify for retrofit rebates.
Applies in: Ontario
A replacement guide tells you what a new furnace costs when one already sits in your basement. This page is for the other two situations: a new build where the furnace has never existed, and an existing home getting ducted heating for the first time. Both are more expensive than a swap, and both have cost traps a replacement quote never shows.
Every range below comes from current 2026 Ontario installer pricing and is attributed. Prices are quoted before Ontario's 13% HST unless stated otherwise.
Installed-price ranges in Canadian dollars for natural gas furnaces, typically before HST:
| Home size | Furnace capacity | Installed range |
|---|---|---|
| Under 1,200 sq ft | 40,000–60,000 BTU | $3,500–$5,000 |
| 1,200–1,800 sq ft | 60,000–80,000 BTU | $4,000–$6,000 |
| 1,800–2,500 sq ft | 60,000–80,000 BTU | $4,500–$6,500 |
| 2,500 sq ft and up | 80,000–100,000+ BTU | $5,500–$8,500 |
Most Ontario homeowners land between $4,500 and $6,500 installed. The ranges above assume ductwork, gas service, and venting exist or need only standard work. The situations below are where the number leaves the range.
In a production build, you are not really buying a furnace — it is buried inside the builder's package. The money question is the upgrade: builders install an entry-level unit and sell stepped-up equipment as an upgrade option. The upgrade price is the only furnace number you negotiate, so ask for the exact model, AFUE, staging, and blower of both the included unit and the upgrade. The price difference should roughly track the equipment difference; if it doesn't, price the same equipment from an independent installer after possession and compare.
In a custom or owner-managed build, the furnace is a real line item and you pay the full installed range above. Two timing decisions save real money: rough the AC lines in at the same time (a furnace plus AC combo runs $7,500 to $14,000 installed, versus two separate mobilizations later), and finalize the furnace choice before drywall so the ductwork is designed around it rather than adapted afterward.
This is the expensive version of the job, and it is what most of the "furnace installation cost" searches are actually asking about. A home heated by baseboards or space heaters needs the entire distribution system built from scratch, and the full project can run $7,000 to $12,000 or more.
The ductwork is the controlling line item. A major ductwork overhaul on an existing system already adds $3,000 to $7,000; a full fresh install is at the top of that band and beyond. Ask for the ductwork priced as its own line, and ask whether exposed runs through unfinished spaces (basement, closets, attic) can substitute for finished-wall routing — it is the cheapest legitimate way to trim this number. The furnace unit itself costs the same as in the table above; the duct system is what makes the quote look unfamiliar.
If the lot has no gas service, this is a separate project with its own rules, and it needs to start early — Enbridge requires the new customer account created and a completed application from your heating contractor before it commits to a connection date.
For new residential services, Enbridge installs one service line per civic address at no charge provided the distance from the property line to the meter location is 20 metres or less. Longer runs are charged at $170.06 per metre beyond the 20-metre allowance, invoiced on the first gas bill. If no gas main exists at the street, Enbridge decides feasibility case by case, and customers may have to pay a contribution in aid of construction — that number is project-specific and should be nailed down before the furnace quote is finalized.
Two smaller line items to know: the first safety inspection when gas is first introduced to a premise is free, and temporary construction heat activation is $128.35 per occurrence.
A quote that is one big number is a quote you cannot compare. For a new install, expect these line items, each priced separately:
Get three itemized quotes and compare line by line, not totals. Rural properties often run higher — fewer installers, equipment transport, and limited contractor availability add to the bill.
Since every new gas furnace in Canada is 95% AFUE or higher, the fuel decision matters more than the efficiency tier. Gas furnaces cost more upfront — the unit runs $3,000 to $4,500 with total installed costs of $4,000 to $7,500 — but are the cheapest to run. Electric furnaces are cheaper to buy ($1,500 to $2,500 for the unit, $3,000 to $5,500 installed) but cost two to three times more to operate at Ontario's time-of-use electricity rates, roughly 11 to 17 cents per kWh. Electric makes sense where there is no gas main and no plan to get one, or in smaller well-insulated homes. Oil sits in the rural middle: $5,500 to $8,500 installed with variable operating costs, and many rural Ontario homeowners are switching to propane or electric.
Ontario's current program, Home Renovation Savings, is a retrofit program: it is built around pre- and post-installation energy assessments of existing homes, and a gas furnace is not itself a rebated measure under the program. New construction does not fit that program design, so budget the install at full price. The interest-free Canada Greener Homes Loan (up to $40,000) closed to new applicants on October 1, 2025, so it cannot be counted on for a new install either. Confirm any program's current terms before counting on a rebate — and never let a promised rebate decide a purchase before the program administrator confirms eligibility in writing.
Two program facts on this page changed after it was written, and both were re-checked against the programs' own pages on November 10, 2026. Home Renovation Savings pays for heat pumps and the other upgrades listed above, not for a gas furnace, and its bundled path requires the energy assessments before and after the work. The Canada Greener Homes Loan is closed to new applicants: October 1, 2025 was the last day to apply, and existing approved borrowers continue under their own loan terms.
One newer program does not change the new-build picture yet. The federal National Heat Pump Rebate was announced on October 8, 2026, with a retroactivity period starting November 1, 2026 and applications opening in early 2027. It pays for heat pumps, not gas furnaces, so a new gas install still budgets at full price. Price a heat-pump option before committing to gas if the rebate could apply to your home.
The Enbridge service charges on this page were also re-checked in the Rate Handbook effective October 1, 2026: the extra-length charge is $170.06 per metre beyond the free 20 metres, before HST; temporary construction heat activation is $128.35 per occurrence; and the first safety inspection when gas is first introduced to a premise is free.
Get the order right and nothing gets ripped out:
| Under 1,200 sq ft (40,000–60,000 BTU) | $3,500–$5,000 installed |
|---|---|
| 1,200–1,800 sq ft (60,000–80,000 BTU) | $4,000–$6,000 installed |
| 1,800–2,500 sq ft (60,000–80,000 BTU) | $4,500–$6,500 installed |
| 2,500 sq ft and up (80,000–100,000+ BTU) | $5,500–$8,500 installed |
| Full duct install (home with no ducts) | $7,000–$12,000+ total |
| Furnace + AC combo | $7,500–$14,000 installed |
Ranges in Canadian dollars, typically quoted before 13% HST. Ranges drawn from current 2026 Ontario installer pricing; the prose above explains each figure.
For a natural gas furnace in new construction, 2026 installed ranges run $3,500 to $5,000 for a home under 1,200 sq ft, $4,000 to $6,000 for 1,200 to 1,800 sq ft, $4,500 to $6,500 for 1,800 to 2,500 sq ft, and $5,500 to $8,500 for 2,500 sq ft and up. In a production build the furnace is part of the builder's package — you pay for it indirectly, and the only decision is whether the builder-grade unit is worth upgrading before drywall.
This is the expensive version of the job. A full duct installation in a home heated by baseboards or space heaters can push the total project to $7,000 to $12,000 or more, before HST. The ductwork alone is the line item that separates this from a like-for-like swap, so get it priced separately and ask whether running exposed ducts in unfinished spaces (basement, closets) can trim the number.
For a new residential service, Enbridge installs one service line per civic address at no charge as long as the distance from the property line to the meter location is 20 metres or less. Beyond 20 metres, you pay an extra-length charge of $170.06 per metre (per the current Rate Handbook). If no gas main exists at the street, the extension may require a contribution in aid of construction, and that number is project-specific.
A 2,000 sq ft home typically falls in the 60,000 to 80,000 BTU band, with 2026 installed costs of $4,500 to $6,500. Have the installer run a proper heat-loss calculation rather than sizing by square footage alone — ceiling height, insulation, and window area all move the number, and an oversized furnace short-cycles and costs more to buy.
Yes. Every new gas furnace sold in Canada is 95% AFUE or higher — the old mid-efficiency 80% tiers no longer exist. So the efficiency question for a new install is no longer 'high-efficiency or not' but which tier of high-efficiency: 95–96% single-stage entry units versus 96–98% two-stage or modulating units.
Compare the full picture. A gas furnace costs more to install — the unit runs $3,000 to $4,500 with total installed costs of $4,000 to $7,500 — while an electric furnace unit costs $1,500 to $2,500 with totals of $3,000 to $5,500. But electric heating runs 2 to 3 times the operating cost of gas at Ontario's time-of-use electricity rates (roughly 11 to 17 cents per kWh), so gas usually wins on lifetime cost wherever a gas main is available.
Generally no. The current provincial program, Home Renovation Savings, is a retrofit program built around pre- and post-installation energy assessments of existing homes, and a gas furnace is not itself a rebated measure under the program: its published upgrade lists cover heat pumps, insulation, windows and doors, air sealing, solar and batteries, and smart thermostats. Budget the new install at full price and treat any rebate as a bonus only if the program administrator confirms eligibility in writing.
In an existing home, most installs take one to two days depending on complexity. In new construction, the furnace goes in during the HVAC rough-in stage, before drywall — the equipment install itself is quick, but it is sequenced with ductwork, venting, gas piping, and electrical work, so the mechanical contractor coordinates it with the rest of the build.
Only a TSSA-certified gas technician holding a G2 or G3 certificate. That applies to new builds and retrofits alike — an unlicensed install can void the manufacturer warranty and create insurance problems. Ask for the technician's certificate number before work begins.
If you want cooling eventually, yes — doing it together is one of the cheapest timing decisions on this page. A furnace plus AC combo runs $7,500 to $14,000 installed, versus paying for two separate mobilizations later. The equipment is matched, the ductwork is designed for both, and the labour overlaps.